Can it still be manufactured within the valid period of the design chapter?

2018-05-08View Original

Thread Content

This post was last edited by Taizhou newcomer on 2018-5-9 07:55. For such equipment, the date of signature on the design drawings was in August 2017, which is already over half a year ago. Regulatory standards are all based on the new design, with the validity period of the design approval being 2021; can manufacturing still take place throughout that validity period? Or........
Reply #22018-05-08
It depends on the specific time of production, and whether there were any changes in regulations at the time it was manufactured.
Reply #32018-05-09
Design is design, manufacturing is manufacturing: L
Reply #42018-05-09
“The valid period of the design seal is until 2021; so can manufacturing still take place throughout that period? Who knows, there are still several years left
Reply #52018-05-09
No, if there are changes in the application standards as indicated in the design drawings, it will have an impact on those drawings. It is necessary to consult the original designer to confirm whether the drawings can still be used.
Reply #62018-05-09
The date in the design section corresponds to the valid period for signing the drawings, and it merely serves to prove that the drawings at that time were compliant and legal. It doesn’t matter whether the date in the design chapter and the drawings can still be used.
Reply #72018-05-09
It is not the manufacturer who decides; it is the designer who determines whether the drawings can still be used for manufacturing.
Reply #82018-05-09
It depends on whether the contract was signed before or after the implementation of the new standards, and it has nothing to do with the validity period of the design certificate. If new standards have been implemented at the time the manufacturing contract is signed, the new standards must be adopted and the design modified. The situation you mentioned is designed according to the new standards; it is certainly possible to manufacture it now, but it doesn’t mean that those drawings can be used for manufacturing throughout the validity period of the design approval.
Reply #92018-05-09
This post was last edited by wanlirn on 2018-5-9 at 14:36. As long as the design falls within the valid period specified for that stamp, it can be used in production. **There is no rule stating that drawings also have a warranty period; in other words, even if a stamp’s validity expires in September 2017 and has not been renewed, it is still possible to use it for production in May 2018. . . If there are standard changes or updates between the design and production phases, it is necessary to approach the original design team to obtain the necessary modifications or to carry out a redesign

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.