Introduction to hydraulic testing, pneumatic testing, and leak testing of pressure vessels

2023-08-18View Original

Thread Content

I. Hydrostatic Testing 1. Clean water is generally used; when conducting hydrostatic testing on austenitic stainless steel pipes, or on pipes that are connected to such pipes or equipment, the chloride content in the water must not exceed 0.005%. If this level poses a negative impact on the pipes or the process, other suitable non-toxic liquids can be used. When flammable substances are used for testing, their flash point must be at least 50℃; 2. The liquid temperature during testing must be no lower than 5°C, and higher than the brittle transition temperature of the corresponding metal material ; 3. For pipes subjected to internal pressure, in addition to the requirements specified in item (5) of this section, the hydrostatic test pressure at any point in the system shall be not less than 1.5 times the design pressure. When the design temperature of the pipe is higher than the test temperature, the test pressure shall not be lower than the value calculated using equation (1). If the stress generated in the pipe at the test temperature exceeds the yield strength of the pipe material, the test pressure shall be reduced to the maximum pressure that does not exceed the yield strength. 4. For pipes subjected to external pressure, the test pressure shall be 1.5 times the difference between the design internal and external pressures, and shall not be less than 0.2 MPa ; 5. When the pipeline and the container are subjected to a hydraulic test as a single system, and the test pressure for the pipeline is less than or equal to that of the container, the test shall be conducted at the pressure specified for the pipeline. If the test pressure for the pipeline is greater than that of the container, and it is not possible to separate the pipeline from the container, while the test pressure for the container is greater than or equal to 77% of the pipeline’s test pressure calculated in accordance with item (3) of this clause, then, with the approval of the design unit, the test may be carried out at the pressure specified for the container ; 6. The test pressure for the inner tube of the jacketed tube shall be determined as the higher of the internal or external design pressure, while the test pressure for the outer tube of the jacketed tube shall be determined in accordance with item (3) of this clause ; 7. The pressure is increased slowly during the test; once the test pressure is reached, it is maintained for 10 minutes. Then the pressure is reduced to the design value, and this level is held for 30 minutes. The test is considered successful if the pressure does not drop and there are no leaks ; 8. During testing, the gas in the pipes must be completely removed. If a leak is detected during the test, it must not be repaired while under pressure; when draining the liquid after the test, care must be taken to prevent the creation of negative pressure. II. Pressure test 1. The gas used for the test shall be dry and clean air, nitrogen, or other non-flammable and non-toxic gases ; 2. It is strictly prohibited to bring the test temperature close to the metal’s brittle transition temperature ; 3. During testing, an overpressure relief device shall be installed, and its set pressure shall not be higher than 1.1 times the test pressure or the test pressure plus 0.34 MPa (whichever is lower) ; 4. The test pressure for steel pipes and non-ferrous metal pipes subjected to internal pressure is 1.15 times the design pressure ; 5. A pre-test must be conducted using the test gas before the actual test, with a test pressure of 0.2 MPa ; 6. During the test, the pressure should be increased gradually and slowly. When the pressure reaches 50% of the test pressure, if no abnormalities or leaks are detected, the pressure should be increased in steps of 10% of the test pressure until it reaches the test pressure. Afterwards, the pressure should be reduced to the design pressure for inspection; a pass is considered to be achieved if no leakage is detected using a foam detector. It is strictly prohibited to tighten bolts while the pressure is still high during the test. III. Leakage Test The leakage test must meet the following requirements: Pipelines transporting extremely hazardous, highly hazardous fluids, as well as flammable fluids, shall undergo a leakage test. 1. The test is carried out after the pressure resistance test is successful; air is preferably used as the testing medium, but according to the provisions in the design documents or relevant standards, halogens, ammonia, or other sensitive gases may be used for a leakage test at lower pressures to assess sensitivity ; 2. The key areas to check during the leakage test are the valve stuffing box, flange or threaded connections, as well as the vent valve, exhaust valve, drain valve, etc ; 3. For the leak test, the pressure is increased gradually step by step. Once the test pressure is reached and the pressure is held constant for 10 minutes, all sealing points are inspected by applying a neutral foaming agent; no leaks being detected constitutes a pass.
Reply #22023-08-18
A hydraulic test primarily involves injecting liquid into a pressure vessel to increase the pressure inside it, thereby testing the vessel’s sealing performance and pressure resistance. During testing, it is important to use clean water or non-toxic liquids, maintain the temperature within a certain range, ensure that the test pressure meets the design requirements, and carry out steps such as gradual pressure increase and pressure holding to guarantee no leaks and stable pressure. A pressure test involves injecting dry and clean gas into a pressure vessel to increase the pressure inside it, thereby testing the vessel’s sealing performance and pressure resistance. During testing, attention must be paid to the selection of the test gas, avoiding temperatures close to the metal’s brittle transition temperature; an overpressure relief device should be installed, and pressure increases and decreases should be monitored to detect any leaks using a foaming agent. The leak test is conducted after the pressure resistance test is passed. It involves filling the pressure vessel with sensitive gases or air, and then inspecting the vessel’s sealing points such as valve packing glands, flanges, and threaded connections, using a neutral foaming agent to detect any leaks. Leakage tests are primarily conducted on pipelines that transport hazardous or flammable fluids. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.