Equipment installation foundation

2018-08-28View Original

Thread Content

While installing the steel frame for the equipment, I encountered an issue with secondary grouting of the foundation. There is a 5 cm gap between the footplates of the steel frame and the existing foundation; that gap was used to adjust the levelness. Now, secondary grouting is required. Is it necessary to insert rebar first before using grouting material for filling that gap? The footplates of the steel frame are 500x500 in size, while the foundation is 750x750. Thank you all!
Reply #22018-08-28
No, just use the grouting material directly
Reply #32018-08-28
Before installation, it is necessary to level the surface by using a plumb line; once it is level, grouting can be carried out directly
Reply #42018-08-29
Direct grouting is sufficient; use expansive cement and vibrate it internally to compact it.
Reply #52018-08-29
Here, we usually just use grouting material for direct grouting

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.