Thread Content
I looked at the labels on some drawings; the signature fields went from drafting, design, proofreading, review, approval to final authorization. The first few levels are specified by TSG; is the approval for this level also stipulated? I have seen 3 types of containers before; starting from the design phase, I have encountered signatures at up to 4 levels. Design, proofread, review, approve. So the question is, what is the maximum number of levels for signing drawings?
Design, proofreading, review, approval, plus standardization; sometimes there is also a process signature
For the process, it requires joint approval. Is there an approval step after authorization?
This post was last edited by AtlantisH on 2018-9-17 at 14:46. The persons responsible for job design, proofreading, review, approval, and the company’s technical leader (in larger engineering design companies, this is usually the head of the container department) are specified; the diagram shows the signing requirements set by Shengli Institute.
Now, the process of approval has been changed to authorization; in your table, “approval” should correspond to “authorization”.
In accordance with the design approval regulations for pressure vessels and pressure pipelines, category I and II vessels require three levels of signature approval, while category III vessels require four levels. If the company has specific rules regarding signatures, those rules shall be followed, provided that they are not less stringent than the requirements set by the standards.
The question is who is authorized to approve this person? Which position? What are the qualification requirements?
It depends on how the system documents of your organization are specified; the standards do not provide any regulations!
No, there isn’t. We have a maximum of level 4; recently, when I looked at other images, I saw that they are at level 5.
That means their system documentation has requirements