Thread Content
The company plans to build a pressure vessel factory for low and medium pressure categories A2. Could experts please provide some guidance on what the requirements are for a non-destructive testing laboratory? Thank you! :handshake
This post was last edited by The wise are enlightened on 2018-12-9 at 14:02. Consult the local environmental protection authorities and public security departments respectively, as there are specific requirements. It must comply with the Law of the People’s Republic of China on the Prevention and Control of Radioactive Pollution, as well as the Regulations on the Safety and Protection of Radioisotopes and Radiation Devices.
Before construction, an environmental impact assessment is required; after construction, acceptance testing is necessary, and a radiation license must also be obtained.
Laws and regulations must be complied with; more importantly, it is essential to maintain proper communication with the local safety and environmental protection authorities!
Area is a requirement for obtaining permits, while radiation licensing is a requirement under environmental protection laws; an environmental impact assessment must be carried out
Environmental impact assessment is something that cannot be avoided; for specific details, one can consult the local inspection agency. Additionally, it’s necessary to take into account the actual conditions of one’s own facility, such as the maximum diameter and length of the products, in order to determine the appropriate specifications for the flaw detection room. After that, all that’s left is to spend the money needed :)
Construction of a radiographic inspection room. . It is to consult the Environmental Protection Bureau. .
The last edit to this post was made by Guxi Village on 2018-12-12 at 14:19. What I mean is that if one doesn’t know the specific relevant agency, they can go and ask the boiler inspection office; and in any case, one will have to deal with that office throughout work – just ask, and the problem will be solved