Thread Content
I would like to ask the senior colleagues: who is responsible for reviewing and signing the welding process operation instructions? Can someone with a pressure vessel inspection certificate do that?
Person appointed by the unit as the welding quality control supervisor
This post was last edited by kareale88 on 2019-1-2 at 15:09. The preparation of the \"Welding Process (Operation) Instructions\" must be carried out under the supervision of welding engineers from the relevant application department. It is also said that it is prepared by the welding process engineer, reviewed by the welding responsibility engineer, and approved by the chief technical officer (general engineer).
Welding responsibility engineer in the quality assurance system for pressure vessel manufacturing
The welding process relates to the welding quality control system; it is not related to the design reviewers, is prepared by the welding process engineer, and reviewed by the welding responsible person (responsible engineer).
Welding responsibility engineer in the quality assurance system for pressure vessel manufacturing. It has nothing to do with the pressure vessel design reviewers.
Approved by the welding responsibility engineer, who is appointed within the organization’s quality assurance system. The signing of this document has little to do with the pressure vessel inspectors; of course, there are also cases where one person holds both the role of welding responsibility engineer and pressure vessel inspector
Manufacturing cannot be confused with design. The welding process is used for manufacturing, and of course it must be reviewed by a welding engineer.
I think it’s not a bad thing if designers know welding.
In some smaller container units, one person holds both the roles of welding responsibility engineer and pressure vessel auditor. When reviewing and signing off on the welding procedure specifications, he is the welding responsible engineer; when reviewing and signing off on design drawings and documents, he is the pressure vessel reviewer. This is allowed, but a formal appointment within the unit’s quality assurance system is required