I have a few questions about boilers

2019-01-29View Original

Thread Content

1. If it involves major maintenance of a boiler, is it necessary for the original design firm to prepare new design documents? I heard that replacing main steam pipes with a diameter of 273 mm or more requires new design documents to be prepared. But what about other tasks that fall under major repairs – do they all also require the original design team to produce new design documents? Or can any entity with boiler design qualifications do it? 2. To increase the number of superheater tubes, does it require design documents prepared by the original design agency, or will documents prepared by any agency with boiler design qualifications suffice? According to the definition of renovation in the Boiler Safety Supervision Regulations, this doesn’t seem to fall under that category, but I think someone should be hired to design it. 3. Boiler Safety Technical Inspection Regulations 5.4.1.1(2): Replacing more than 50% of the entire set of heating surfaces; by “entire set,” does it refer to each component such as the economizer, superheater, and water wall as a separate unit?
Reply #22019-05-07
Any contractor with the necessary construction qualifications can carry out the work. Construct according to the original drawing. But it must be reported to the boiler inspection agency
Reply #32019-06-10
1. Renovation requires design documents prepared by qualified units; this is not necessary for major repairs. 2. Adding heating surfaces constitutes a change in the structure of pressure-bearing components, and should therefore be considered part of the renovation. 3. The entire set of heating surfaces is determined by the design drawings; if components such as economizers are designed as multiple sets, they should be calculated separately.
Reply #42019-06-10
The boiler does not have a design qualification; instead, the company designs the boiler and then submits the drawings to the relevant authorities for approval.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.