HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Licensing Rules for Special Equipment Production and Filling Units TSG07-2019

2019-05-23View Original

Thread Content

This post was last edited by zjq1962 at 2019-5-23 08:02 The official version of TSG07-2019 Special Equipment Production and Filling Unit Licensing Rules will be implemented on June 1, 2019. You can also download it from the website of the State Administration for Market Regulation
Reply #22019-05-23
Is there any expert who can analyze and analyze the changes?
Reply #32019-05-23
Isn’t it on the website of the State Administration for Market Regulation?
Reply #42019-05-23
The manufacturing unit originally had an A2 manufacturing license and a D-level design license. According to the regulations of TSG07-2019, the D-level design license may not allow A2-level design. Or does it need to obtain an A2 design license of the same level?
Reply #52019-05-23
The design license is Class D, and medium and low pressure Class III pressure vessels cannot be designed. In this case, the design must be commissioned.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.