May I ask everyone, where are the installation requirements and tolerances for in-situ level gauges specified?

2020-05-04View Original

Thread Content

1) The allowable tolerance for the distance between the two connectors is ±1.5mm; 2) The distance between the centerlines of the two connectors shall not exceed 1.5 mm ; 3) The vertical distance between the centerlines of the two pipe flanges shall not exceed 1.5 mm ; 4) The perpendicularity tolerance of the flange surface shall not be greater than 0.5%. Which standard does this come from? ?
Reply #22020-05-04
NB/T47041 P52 and NB/T47042 P102 contain relevant information
Reply #32020-05-04
Check HG20584—2011, the section on the manufacturing of chemical containers
Reply #42020-05-08
Detailed regulations are provided in both the standards for horizontal vessels and those for vertical vessels

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.