Dear seniors, in which standard or specification does the statement “A dual flame arrester should be installed in parallel before the fuel gas enters the furnace” appear?

2020-09-23View Original

Thread Content

Dear seniors, where in which **book or industry standard specification can I find the statement that \"two flame arrestors should be installed in parallel before the fuel gas enters the heating furnace, so that they can be switched and maintained during production\"? Thank you!
Reply #22020-09-23
The source is listed in the Baidu entry for pipe flame arresters.
Reply #32020-09-24
\"Guidelines for the Installation of Interlock Protection Systems in Tubular Heating Furnaces in Sinopec’s Refining Units\" 2.10 Parallel dual flame arresters should be installed near the burner for the pilot light fuel gas and main fuel gas pipelines, to enable switching operations.
Reply #42022-08-26
I agree with what was said above; I’m also troubled by this issue

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.