HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For the factory-out registration of complete special equipment, a usage certificate must be obtained prior to use

2021-01-08View Original

Thread Content

TSG21 stipulates that special equipment units must undergo registration before being put into use. What does it mean by \"units leaving the factory\"? Also, after notifying the relevant authorities of the installation of a new pressure vessel, is it necessary to go to the special inspection agency for installation acceptance (other than supervision during installation)?
Reply #22021-01-08
This is a name that emerged in the new technical specifications; there is no explanation for it. In my opinion, it refers to those mobile units or equipment systems mentioned in previous regulations, and the explanations provided by the authorities are sometimes contradictory. According to the technical specifications, installation acceptance is not required for newly installed pressure vessels, nor is there any installation inspection. However, various places may continue to require a pre-commissioning inspection report in accordance with previous practices.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.