HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The length of the high-neck flange of the SW6 tower is not included in the total height of the tower

2021-03-20View Original

Thread Content

The DN500 tower has a total height of around 15 m; there are 6 equipment flanges in the middle (with a height of 100 mm), and this 600 mm is not included in the total height of the tower in the calculation results. I think there’s something wrong with this approach, as NB/T47041-2014 doesn’t mention towers with equipment flanges. I plan to increase the height of each flange to match that of the corresponding section – does anyone think this is feasible?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.