HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

As the representative of Party A, what should be noted regarding the large tanks manufactured on-site?

2021-04-08View Original

Thread Content

I implore all the experts! ! As the representative of the client, what should be paid attention to regarding the large tanks being manufactured on site? There are those national standards and industry standards. We are in the chemical industry. It is mainly used for storing coal tar. Storage capacities are 55 tons and 100 tons.
Reply #22021-04-08
1. Keep an eye on the supervisor and follow the \"Supervision Plan\"; 2. Conduct strict inspections at the stop-check points in accordance with the Quality Control Plan.
Reply #32021-04-08
Compare with the drawings; as long as it meets the requirements of the drawings, it’s fine.
Reply #42021-04-09
Key milestones in the quality control plan, items that require close monitoring, such as welding quality and welding materials.
Reply #52021-04-09
There are construction schedule milestones, right? Keep an eye on them

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.