HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Tests on slip systems for steel structures

2021-07-31View Original

Thread Content

May I ask, is it necessary to install a anti-slip system at all the bolted connections in steel structure projects? Since what we are installing now is just a pipe corridor, do we also need to follow the requirements outlined in the same standards?
Reply #22021-07-31
Is it mentioned in GB 50205? Take a look
Reply #32021-08-01
It states that the anti-slip coefficient needs to be tested for each treatment process

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.