HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Where are there clear regulations regarding heat treatment after welding a transition layer on equipment flanges?

2024-01-31View Original

Thread Content

Experts, which document specifies this clearly? Is stress-relief heat treatment required after welding a transition layer on the equipment flanges of heat exchangers, or is it based on experience?
Reply #22024-01-31
Whether stress-relief heat treatment is required after welding a transition layer on the equipment flanges of heat exchangers is generally determined in accordance with the ASME Boiler and Pressure Vessel Code (the code issued by the American Society of Mechanical Engineers for boilers and pressure vessels). For specific details, refer to ASME Section VIII (Pressure Vessels) or ASME Section IX (Welding and Brazing Qualifications). The specific requirements vary depending on the material, welding process, and design specifications; therefore, it is necessary to determine on a case-by-case basis whether heat treatment is required. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.