(1) Determine the longitudinal center line of the equipment based on the installation diagram of the roller conveyor; this serves as the reference for its installation. Within the workshop, this longitudinal center line is usually marked using the framework of the factory’s columns as a reference. (2) If the equipment related to the roller conveyor line has already been installed, the center line of such equipment is determined primarily based on the relevant dimensions of those adjacent devices, with the dimensional relationship to the factory’s column grid serving only as a reference. This ensures that the roller conveyor system can operate stably and reliably. (3) After determining the central position, connect the roller conveyor frame to the legs as indicated in the installation diagram, install the drive frame and motor, then attach the nylon straps and the chain. Next, install the drive rollers and the direction-changing sprockets (make sure that the end faces of the two sprockets are in the same plane during installation), and adjust the position of the conveyor motor so that the chain is properly tensioned. (4) Adjuster feet for the device’s roller conveyor. Ensure that the adjustment feet reach the scale of the planning device. (5) Guardrails for the roller conveyor system, electrical control systems, motor guards, etc. (6) After checking that the roller conveyor is in order, start the machine without a load for a test run. Adjust some that do not meet the planning requirements and standards. During the trial run of the roller conveyor, it is necessary to check the tightness of the chain as well as the condition of its engagement with the roller sprockets; any issues should be adjusted promptly.
Learning about it*, thanks to the original poster for sharing