HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Processing Equipment】The Xijiang Area 24 project, which set multiple records from 2014 to 2025, saw the completion and shipment of its 24-7 WHPA upper module in Qingdao

2025-07-02View Original

Thread Content

Let’s give praise and support to the achievements made in China’s chemical engineering technology and equipment sector; your participation in discussions is the greatest encouragement. **********************【Ten Years of Progress in Chemical Engineering Equipment】Regular updates and summaries are available – feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html *****************The upper module of the 24-7 WHPA unit for the Xijiang Area 24 development project has been completed and shipped out in Qingdao. Recently, the upper module in question was finished and dispatched from the international high-end equipment manufacturing base located in the West Coast New Area of Qingdao. This platform has set multiple records, including the first-ever use of a technology for the prefabricated assembly and lifting of electrical modules as a whole, as well as a debugging method for supplying medium-voltage power to the upper structural components via shore power. The total weight of this module is approximately 3,310 tons. Its main structure consists of two decks; the main deck is 36.3 meters long and 36.1 meters wide, with a projected area equivalent to that of 3 basketball courts. Multiple digital technologies are applied in the design, enabling functions such as intelligent oil production, intelligent equipment operation and maintenance, and intelligent security. The Xijiang Area 24 Development Project is a digital transformation project for offshore oil fields. The operation depth is approximately 90 meters. A new unmanned platform, Xijiang 24-7, 1 underwater pipeline for mixed transport with a length of 8.5 kilometers, and 1 umbilical cable with a length of 8.5 kilometers will be constructed, while the Xijiang 24-3B platform will be upgraded. The 24-7 WHPA upper module will be transported over 2,000 kilometers by sea to the Xijiang Oil Field area, where the module lifting operations will commence; once in operation, it will serve the Xijiang Oil Field area in the eastern South China Sea.
Reply #22025-07-03
Kudos to the development of chemical engineering technology and equipment in China!
Reply #32025-07-04
【Ten Years of Rapid Development in Chemical Equipment】2492-2025: Lanzhe Energy’s pilot plant for the production of thousand-ton-scale Fischer-Tropsch synthesized jet fuel fractions passes evaluation https://bbs.hcbbs.com/thread-5696189-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.