Thread Content
Construction of the floating solar project in Indonesia undertaken by a Chinese company has begun. The 60-megawatt floating solar project in Saguling, Indonesia, carried out by China Energy Engineering Group’s Gezhouba Corporation, saw its construction kick off on September 25, 2025; this marks the official start of work on this green energy project, which is expected to generate 129 million kWh of electricity per year. It is understood that this project is the first to be constructed under Indonesia’s new electricity plan (2025–2034), and it is located in the Saguling Dam reservoir area in Bandung, West Java Province, Indonesia. The project utilizes floating photovoltaic technology, with solar panels installed on floating structures on the water surface. Compared to traditional ground-based photovoltaic power plants, this approach not only saves land resources but also reduces water evaporation, suppresses algae growth, and improves power generation efficiency. The project will involve the construction of a 60-megawatt floating photovoltaic power plant on water, a 150-kilovolt step-up substation, an 8.5-kilometer long 150-kilovolt double-circuit transmission line on the same tower, and a 150-kilovolt switchyard. Upon completion, the project will save 56,000 tons of standard coal per year and reduce carbon dioxide emissions by 149,000 tons. During the project construction period, it is expected to create over 1,600 direct and indirect jobs locally, thereby significantly boosting the regional economic and social development.
【Haichuan Teahouse】You are welcome to join! ! ! The leisure section for National Day and Mid-Autumn Festival keeps costing money! ! ! ! https://bbs.hcbbs.com/thread-5702022-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2705-2025 Research and Demonstration Project on Key Technologies for Large-Scale Advanced Electrical Energy Storage – the 50 megawatt/100 megawatt-hour digital energy storage demonstration project – has passed the acceptance review. https://bbs.hcbbs.com/thread-5701879-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan Explores the World】What is a sand battery? https://bbs.hcbbs.com/thread-5702064-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2707-2025 – Like it! Tianjin Petrochemical uses self-developed wall-crawling robots to overcome the challenges in inspecting pipes at high heights https://bbs.hcbbs.com/thread-5701892-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】International Leadership in Revolutionary Technologies for Dehydration through Coupled Reactions of Solid Materials 2698-2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】100% domestic production of key equipment from 2027 to 2025! The world’s largest coal-fired power plant carbon capture demonstration project has been put into operation at Huaneng Zhengning Power Plant in Gansu, China. https://bbs.hcbbs.com/thread-5701920-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s largest 5,000-square-meter \"air capture umbrella\" was shipped to Inner Mongolia for testing, 2711–2025 https://bbs.hcbbs.com/thread-5702018-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The largest domestic sulfur-containing natural gas purification plant, with a processing capacity per unit of 2716–2025, was put into operation in Anyue, Sichuan. https://bbs.hcbbs.com/thread-5702301-1-1.html (Source: Haichuan Chemical Industry Forum)