【Corrosion Technology Edition】Daily Question 20170725: From which aspects is the damage caused by pitting evaluated?

2017-07-25View Original

Thread Content

To increase the popularity of the Corrosion Technology section, foster communication among users, and enable mutual progress and improvement, the [Daily Question] activity has been launched. Reward rules: 3 wealth points for replying, 10 wealth points for correct answers. This topic is valid for two days; no scoring or rewards will be given after that. Definition: From which aspects is the damage caused by pitting evaluated? To assess damage caused by pitting corrosion, it is necessary to take into account the number of pits per unit area ; Diameter of the pit ; The depth of the pit. ====================================== Event Promotion: Petrochemical Zone – “Creative Ideas for Energy Saving” event (the second phase is in full swing) http://bbs.hcbbs.com/thread-1666758-1-1.html (Source: Haichuan Chemical Industry Forum) 2017 Coal Chemical Industry Event – “My Technical Upgrades” http://bbs.hcbbs.com/thread-1786290-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #22017-07-25
To assess the damage caused by pitting, it is necessary to take into account the number of pits per unit area, the diameter of the pits, and the depth of the pits.
Reply #32017-07-25
Appearance, weight, dimensions, mechanical strength, organizational structure, etc
Reply #42017-07-25
The last edit to this post was made by Peng Zuosen on 2017-7-25 at 13:49. To assess the damage caused by pitting corrosion, it is necessary to take into account various factors, including the number of pits per unit area; Diameter of the pit ; Depth of the pit
Reply #52017-07-25
Number of pits per unit area; Diameter of the pit ; The depth of the pit.
Reply #62017-07-25
To assess the damage caused by pitting corrosion, it is necessary to take into account the number of pits per unit area, the diameter of the pits, and the depth of the pits.
Reply #72017-07-25
To assess damage caused by pitting corrosion, it is necessary to take into account the number of pits per unit area; Diameter of the pit ; The depth of the pit.
Reply #82017-07-25
To assess the damage caused by pitting corrosion, it is necessary to take into account the number of pits per unit area; Diameter of the pit ; The depth of the pit.
Reply #92017-07-25
(1) Number of pits per unit area; (2) Diameter of the pits; (3) Depth of the pits, etc
Reply #102017-07-25
To assess the damage caused by pitting corrosion, it is necessary to take into account the number of pits per unit area, the diameter of the pits, and the depth of the pits.
Reply #112017-07-25
The higher the pitting coefficient, the more severe the pitting is. To assess the damage caused by pitting, it is necessary to take into account the number of pits per unit area, the diameter of the pits, and the depth of the pits.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.