Thread Content
1. Painting engineering design 2. Validation of painting engineering design 3. Reports for painting projects 4. Estimates and budgets for painting projects 5. Bidding processes for painting projects 6. Inspection and approval by the painting contractor of any hidden defects prior to painting (quality of surface treatment on steel structures and application of the first coat of primer; quality of waterproofing layers on the sides of concrete structures in contact with soil, as well as the strength of concrete structures) 7. Preparation of painting plans 8. Sending coatings for testing and conducting on-site painting tests 9. Revision of painting plans 10. Surface preparation of the substrate (involvement of supervisors responsible for ensuring high-quality work or ordinary quality control personnel; implementation of a construction log system) 11. Coatings for painting steel structures, sealant coatings for painting concrete structures 12. Intermediate coatings for painting steel structures 13. Coatings for painting steel structures, topcoat coatings for painting concrete structures 14. Final inspection and evaluation of painting project quality 15. Completion acceptance and handover for use
1. Painting engineering design 2. Justification for painting engineering design 3. Budgeting for painting projects 4. Reports related to painting projects 5. Bidding processes for painting projects 6. Inspection and approval by the painting contractor of any concealed elements prior to painting 7. Preparation of painting plans 8. Submission of paint samples for testing and on-site painting trials 9. Revision of painting plans 10. Surface preparation of the substrate, along with implementation of a construction log system 11. Paints for steel structures, and sealant coatings for concrete structures 12. Intermediate coats for steel structure painting 13. Paints for steel structure painting, and topcoat coatings for concrete structures 14. Final inspection and evaluation of painting project quality 15. Completion acceptance and handover for use.