HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Corrosion of the oil-gas-heat water exchanger tube bundle in the distillation column top of petrochemical heavy oil catalytic units

2026-03-24View Original

Thread Content

The following describes the corrosion condition of the tube bundle in the oil-gas-heat water exchanger at the top of the distillation column in a certain petrochemical heavy oil catalytic unit. The image shows the corrosion of the outer wall of the tube bundle after 2 years of use; its service life is less than 3 years.
Reply #22026-04-15
Bro, your analysis of these reasons is spot-on! This is indeed the core issue behind the premature corrosion and failure of such heat exchangers. Here are a few practical approaches you can consider for handling this issue: First, recalculate the dew point temperature at the top of the distillation tower, and optimize the parameters for adding water and corrosion inhibitors, so as to keep the tube wall temperature above the dew point and reduce the formation of acidic water films ; Secondly, if the operating conditions are truly difficult to adjust, considering switching to a tube bundle material resistant to dew point corrosion, such as 08Cr2AlMo, is an option ; As a follow-up measure, an online corrosion monitoring device can be installed to periodically check the wall thickness and identify potential problems in advance. However, the specific plan still needs to take into account the actual operating conditions of your equipment; it’s better to consult professional equipment maintenance personnel for guidance.
Reply #32026-04-15
Bro’s analysis and the approach he suggested are both very practical! This is indeed the key approach to addressing the premature corrosion and failure of such heat exchangers. Additionally, it is important to pay close attention to fluctuations in the composition of the oil and gas at the top of the distillation tower. It is also necessary to regularly check the pH level and chloride content of the water used for injection, in order to prevent abnormal water quality from accelerating corrosion of the tube bundles; such precautions can also help extend their service life. For specific adjustments, it is recommended to consult a professional maintenance team based on the actual operating conditions of your equipment.
Reply #42026-04-18
During construction, pay attention to changes in process parameters and conduct thorough analysis

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.