HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Energy analysis Aspen

2018-05-27View Original

Thread Content

When performing an energy analysis in Aspen, common engineering facilities were added; the reboiler at the bottom of the tower shows a red cross, the temperature at the bottom of the tower is over 90 degrees, and the low-pressure steam supplied has a temperature of 170 degrees. What is causing this problem?
Reply #22018-05-27
Does it have an impact on the heat exchange network? How can it be modified? Please help

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.