HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Adjustment of raw material structure for synthetic ammonia production at Sanning and progress in the construction of a project for the co-production of 600,000 tons per year of ethylene glycol

2019-09-06View Original

Thread Content

Progress on the Adjustment of Raw Material Structure for Sanning Ammonia Production and the Construction of a Project for the Co-production of 600,000 tons per year of ethylene glycol / Author/Source: Sinochem 13th Construction Company / Date: 2019-09-06 / Clicks: 12. The equipment required for the project, such as the methanol-water separation tower, the heat regeneration tower, and the feed heater, has been successfully delivered for use in Hubei Sanning’s ammonia production facility and its ethylene glycol production project. The equipment to be lifted during this phase mainly includes the methanol-water separation tower and the heat regeneration feed heater. The net height of the methanol-water separation tower is 36 meters, and its net weight is approximately 47.5 tons.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.