Progress in the construction of the Jiujiang Heart-to-Heart Fertilizer Industry Upgrade project

2020-07-14View Original

Thread Content

Progress on the Construction of the Jiujiang Xinlianxin Fertilizer Industry Upgrading Project Author/Source: Jiujiang Xinlianxin Fertilizer Co., Ltd. Date: 2020-07-09 Clicks: 293 At 16:00 on July 7, the anti-surge tests for stages one and two of the air separation booster units built as part of the Jiujiang Xinlianxin Fertilizer Industry Upgrading Project were completed. The successful commissioning of the booster pump indicates that the design, manufacturing, installation, and joint testing of the three compressor units, which are the core power equipment in air separation systems, have all withstood the tests. At 9:58 on July 6, the A exhaust fan of Boiler 1 in the Jiujiang Heart-to-Heart Large Project was started; the B exhaust fan was started at 10:16. At 14:08, both the exhaust fans and the supply fans were brought online one after another, and the system began to operate under light load, with the boiler fans undergoing joint tests.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.