HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The relocation and upgrading project of Jiangsu Jinkong Equipment Xinhengsheng Chemical has entered the critical stage of feeding materials for trial operation

2025-03-17View Original

Thread Content

The relocation and upgrading project of Jiangsu Jinkong Equipment Xinhengsheng Chemical Co., Ltd. (referred to as “Xinhengsheng Company”) has entered the critical stage of commissioning with material feeding. It is reported that the urea relocation and technological upgrade project aligns with the new development concepts, embarking on a second phase of development aimed at moving toward higher quality, greater intelligence, and greener practices. The company carries out technological innovation in the field of new materials; during the production of its second-phase project, it will employ polylactic acid polymerization techniques to implement digital and intelligent production methods. Project Overview: The expansion and upgrading project of Jiangsu Jinkong Equipment Xinhengsheng Chemical Co., Ltd., which aims to increase production capacity to 400,000 tons of synthetic ammonia and 600,000 tons of urea per year, utilizes advanced technologies such as the Spaceway semi-waste boiler gasification technique, Huashuo shift reaction, Dalian University of Technology’s low-temperature methanol washing process, Zhongtai liquid nitrogen washing, Casali ammonia synthesis, and Keyang sulfur recovery. In the first phase, the plant will have a production capacity of 400,000 tons of synthetic ammonia, 600,000 tons of urea, and 47,800 tons of concentrated sulfuric acid. The project is located in the Suhua area of Xinyi City’s chemical industry cluster, with a total investment of 4.978 billion yuan. In its first phase, it will produce 400,000 tons of synthetic ammonia and 600,000 tons of urea per year (including 600,000 tons of urea-based compound fertilizers), as well as 47,800 tons of concentrated sulfuric acid ; Phase 2 will have an annual production capacity of 200,000 tons of ethylene glycol, with by-products including 150,000 tons of methanol, 6,700 tons of dimethyl carbonate, and 17,600 tons of mixed polyols. The project is located in the Economic and Technological Development Zone of Xinyi City, Jiangsu Province, and is a key construction project at both the Xuzhou city level and the Xinyi county level. Once completed and put into operation, this project will play a significant role in promoting the healthy development of the industrial chains in Xuzhou City and Xinyi City, and it will also contribute to the high-quality economic development of the surrounding areas.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.