HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Key points in the review of chemical engineering design drawings

2021-05-13View Original

Thread Content

Dear design experts, what are the main aspects that are examined during the review of chemical engineering design drawings?
Reply #22021-05-13
The focus of review varies depending on the design stage, professional field, and project role; in principle, it shall be carried out in accordance with the Provisions on the Review of Construction Project Construction Drawing Design Documents (Jian She [2000] No. 41). In the case of a review of construction drawings prior to project construction, the focus is on checking whether the construction, installation, and acceptance standards are appropriate; whether the materials chosen are consistent and suitable, and whether they can be used as substitutes; whether there are any errors or contradictions; and whether there are any technical issues that make construction impossible or difficult, as well as any aspects that hinder production operations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.