Operating conditions of steel-lined equipment

2021-05-14View Original

Thread Content

Question: Can storage tanks with a steel lining and PTFE be used when the ambient temperature is between minus 20 and minus 30 degrees Celsius?; (My master told me that steel-lined PTFE storage tanks can only be used above zero degrees, but many online sources claim they can be used at minus 200 degrees Celsius. Is there a difference in the manufacturing process?) ) Are there any materials available for systematic study on steel-lined plastic equipment? Standard documents similar to GB150, GB151, etc
Reply #22021-05-15
GBT 35974.1~.5-2018 Pressure Vessels Made of Plastics and Their Linings
Reply #32021-05-15
My personal opinion is that it depends on the operating conditions; if the temperature of the medium is at room temperature, it should have little impact on steel-lined equipment
Reply #42021-05-17
Since the device does not provide insulation and is used outdoors where the ambient temperature can drop to minus 30°, can it still be considered to operate under normal temperature conditions? Should low temperatures not be taken into account?
Reply #52021-05-18
So what is the temperature of that medium? Pipe design generally determines the pipe material based on the medium being transported. For media at normal temperatures, there’s certainly no need to consider low temperatures. But I don’t understand the concept of lack of insulation – with such low ambient temperatures, doesn’t that affect the normal transportation of the medium?
Reply #62021-05-18
The tanks produced by our factory are used by customers who place them outdoors, with no insulation; they are used under normal conditions in an environment where the temperature can drop to minus 30 degrees Celsius
Reply #72021-05-19
There were design institute drawings when the other party customized it, right? If so, the design institute should have taken the on-site environmental conditions into account ; If not, it’s best to mention it in the contract.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.