HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

fire separation distance

2021-09-13View Original

Thread Content

1. Must the distance between the plant’s wastewater treatment tanks and the corresponding equipment (blowers, filter presses, pumps, etc.) and the flare comply with the requirements of petrochemical regulations? 2. What are the specific standard requirements for oily wastewater in this area? Such as oil content, COD?
Reply #22021-09-13
COD, sulfides, ammonia nitrogen, BOD, etc
Reply #32021-09-14
Thank you. I’m wondering if there are any relevant experience values; for example, is it only when COD is 1000 that it is considered oily wastewater?
Reply #42021-09-15
If there is an oil separator, refer to Table 4.2.12 of the petrochemical regulations

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.