Thread Content
On September 1, a tender announcement was issued for the PC general contracting of the 450,000-kilowatt wind power-to-hydrogen and green methanol integration demonstration project in Diaobingshan, Liaoning, by Huaneng Liaoning. According to the tender announcement, the PC general contracting project for the 450,000-kilowatt wind power-to-hydrogen coupled green methanol integration demonstration project in Tiaobingshan, Liaoning Huadian, is located in Tiaobingshan City, Tieling Province, Liaoning Province. The project involves the construction of a 450MW wind farm, transmission lines and step-down stations, connection to the power grid, facilities for water electrolysis to produce hydrogen and for hydrogen filling, plants for the production of 100,000 tons per year of synthetic methanol along with related distillation processes, as well as facilities for the compression and purification of 150,000 tons per year of carbon dioxide. It also includes auxiliary buildings, a central laboratory, a central control room, facilities for storing hydrogen, as well as utilities such as water, electricity, and steam supply systems. Compliance period for the tendered project: September 28, 2025 – June 20, 2027. The scope of the tender specifically includes general construction contracting – PC general contracting (CHDTDZ059/19-ZB-01201): all tasks related to the wind power component of the 450,000-kilowatt wind power-to-hydrogen coupled green methanol integration demonstration project in Tiaobingshan, Liaoning Province (excluding the procurement of wind turbines), as well as the procurement of equipment for the chemical processing section, the transmission lines, and the grid connection system; equipment installation; construction work; long-term land leasing, temporary land use; assistance with permanent land acquisition; handling of various procedures; commissioning, testing, trial operation; handover to operational status; and the warranty period. All these efforts are aimed at ensuring the achievement of the **Quality Project Gold Award**. Joint bids are not accepted for this project.
【Ten Years of Rapid Development in Chemical Processing Equipment】2647-2025: Zhejiang Zhongkong’s world’s first large-scale temporal model for the process industry is now available for use https://bbs.hcbbs.com/thread-5700490-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first static bulk crystallizer for the production of chemical raw materials used in aramid products was successfully installed between 2026 and 2025. https://bbs.hcbbs.com/thread-5700494-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】China’s first 90MPa high-pressure compressor passed project acceptance in 2025 https://bbs.hcbbs.com/thread-5700513-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Great Development in Chemical Equipment】2654-2025: China’s photovoltaic industry bids farewell to “exorbitantly priced imported films”; Shenghong Petrochemical’s 100,000-ton/year polyolefin elastomer project has been put into operation. https://bbs.hcbbs.com/thread-5700638-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature carbonization technology for coal from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2658-2025: China’s first adsorption tower circulation oil pump was successfully tested at Jiujiang Petrochemical https://bbs.hcbbs.com/thread-5700823-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, the domestically developed 10-kilowatt oscillating water column wave energy generator “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Frontiers of HaiChuan Chemical Technology】Amazing! The Dalian Institute of Chemical Physics has made significant progress in the field of photocatalytic hydrogen isomerization, achieving hydrogen isomerization at room temperature. https://bbs.hcbbs.com/thread-5700909-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)