Thread Content
The space required for equipment maintenance and the operating space for valves need to be properly considered. There are some other issues in this diagram as well; can you spot them?
【Ten Years of Rapid Development in Chemical Equipment】2823-2025: Zhejiang Xinhecheng becomes the third company in the world to master the technology for producing bio-based PPS products. https://bbs.hcbbs.com/thread-5705209-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】Why is the reducer at the pump inlet eccentric? ? https://bbs.hcbbs.com/thread-5705472-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2823-2025: Zhejiang Xinhecheng becomes the third company in the world to master the technology for producing bio-based PPS products. https://bbs.hcbbs.com/thread-5705209-1-1.html (Source: Haichuan Chemical Industry Forum)
【Great Article Sharing】The Decade-Long Gamble on \"Coal-to-Olefins\": What Have We Won, and What Have We Lost? https://bbs.hcbbs.com/thread-5705491-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, the Three Gorges Group’s Ulanqab \"integration of power generation, transmission, distribution, load handling, and energy storage\" pilot facility successfully produced liquid hydrogen. https://bbs.hcbbs.com/thread-5705274-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】Delivery of the first modular submerged combustion vaporizer (SCV) unit in China that utilizes a floating storage and regasification unit (FSRU), 2828–2025 https://bbs.hcbbs.com/thread-5705393-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made seawater desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Common Issues in Haichuan Pipeline Design】Lack of insulation in pipes for outdoor eye wash stations https://bbs.hcbbs.com/thread-5705732-1-1.html (Source: Haichuan Chemical Industry Forum)