On December 4, Qinghai Longyuan New Energy Co., Ltd., a subsidiary of Qinghai Company, issued an open tender for grid connection testing and simulation modeling services related to the 50MW/300MWh molten salt energy storage project in Golmud. Project Overview: The grid connection testing and simulation modeling project for the 50MW/300MWh molten salt energy storage system of Qinghai Longyuan New Energy Co., Ltd. is located in the Kunlun Economic and Technological Development Zone in Golmud. This project has seen the construction of a 150MW molten salt electric heater system, along with a corresponding 6-hour molten salt heat storage system, a 50MW steam turbine generator set, and other auxiliary facilities. Additionally, an 110kV step-up substation has been built, and the 110kV transmission lines are connected to the Golmud East collection station via a “π” configuration. Scope of the tender: In accordance with the approval opinions regarding the project’s integration into the system and relevant requirements of the power grid, carry out grid connection tests and simulation modeling for the 50MW/300MWh molten salt energy storage project in Golmud. Including but not limited to generator leading-phase tests, PSS function tuning tests, unit AGC function tests, unit AVC function tests, power quality tests, system reactance calculation tests, unit load-shedding tests, unit protection tests, and various specialized meetings related to grid connection acceptance ; Among them, the simulation modeling report (which must bear the CANS/CMA certification mark) needs to be approved and accepted by the State Grid Qinghai Electric Power Control Center. Main qualification requirements for bidders: 1. Performance requirement: From December 2022 to the bid submission deadline (subject to the contract signing date), the bidder must have at least one contract related to power grid testing services or power plant simulation and modeling services. The bidder must provide a contract that demonstrates compliance with this performance requirement; the scanned copy of the contract must include the pages with the signatures of both parties, the contract signing date, and the key information specified in the performance requirements. 2. Joint bids are not accepted for this project.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt hydrocarbon and wastewater hydrogen production system converts wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the bell-mouth angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】 The first prefabricated module for the entire plant’s process pipe rack under PetroChina’s Blue Ocean New Materials Project (2872-2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】 From 2885 to 2025, Pingmei Shenma Hydrogen Chemistry Company successfully achieved the domestic substitution of spare parts for the high-pressure coal slurry pumps used in its gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))