The review meeting for the 60% scale model of the Inner Mongolia Shuangxin PVA project was successfully completed. Recently, the review of the 60% scale model for this project, whose detailed design was carried out by Tianchen Company, was successfully concluded. This review meeting was led by the piping and process team, with participants conducting reviews of facilities such as VAC and the VAC intermediate tank area as required. The meeting focused on the design scheme, with in-depth discussions held on key aspects such as the process flow, equipment layout, and pipeline routing. The piping team provided a comprehensive explanation of the 3D models and held thorough discussions with the client, reaching agreements on improving operational convenience, eliminating dead zones in the pipelines, optimizing the layout of pumps and machinery, and ensuring adequate space for passage – all of which lay a solid foundation for creating high-quality design outcomes. The successful completion of this model review marks an important milestone for this project. The project team at Tianchen Company will follow the group company’s \"135\" development strategy as a guide, implement each of the review suggestions one by one, continuously refine the details of the models and improve the accuracy of the designs, so as to deliver a satisfactory result to the client and the company.
Reply #22025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for agglomeration using coal gangue on a scale of tens of millions of tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】2899-2025: Hengyang Valin Steel Pipe collaborates with Danielei to build the world’s largest hot-rolling production line for seamless steel pipes https://bbs.hcbbs.com/thread-5708317-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-15
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-16
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2900 to 2025: Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has been in operation at a polyolefin plant in Tianjin for over 30 days. https://bbs.hcbbs.com/thread-5708326-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】Full capacity operation achieved for China’s most remote offshore wind power projects by 2025 https://bbs.hcbbs.com/thread-5708401-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed its own 30-kilowatt methanol-hydrogen combined heat and power system, which was then delivered. https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.