HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hualu Engineering won the bid for the EPC of polyolefin packaging and automated warehouse projects for the Shenhua Baotou coal-to-olefins upgrade demonstration project

2026-01-01View Original

Thread Content

Recently, the winning bidder for the EPC general contract for the polyolefin packaging and automated warehouse facility in Shenhua Baotou Coal-to-Olefins Upgrade Demonstration Project was announced: the winning contractor is Hualu Engineering Technology Co., Ltd., with a bid amount of 287.57 million yuan. The polyolefin packaging and automated warehouse are part of the utility facilities; the Shenhua Baotou project involves the construction of new packaging and automated warehouse facilities, shift change rooms, forklift charging areas, and other related structures. This facility is used to store polyolefin pellets delivered by the upstream polypropylene and polyethylene production units, which are then automatically packaged into 25kg bags. The packaged bagged materials are stacked and covered with plastic film, after which they are transported by RGV carts and aisle stackers to an automated vertical warehouse for storage. When it is necessary to transport and load the goods, they are discharged using a aisle-type stacker/conveyor system, and then forklifts are used to load them onto trucks or trains. The Shenhua Baotou project is equipped with 6 automatic retort pouch packaging lines, and the storage capacity of the automated warehouse is ≥23,040 units. The Shenhua Baotou Coal-to-Olefins Upgrade Demonstration Project is an upgrade and demonstration project carried out by Guoneng Baotou Coal Chemical Co., Ltd. on the basis of the world’s first coal-to-olefins demonstration plant, which has been in operation for many years. It is included among the major projects scheduled for the 13th Five-Year Plan as outlined in the \"Plan for the Innovative Development of the Modern Coal Chemical Industry\" issued by the National Development and Reform Commission and the Ministry of Industry and Information Technology. The Shenhua Baotou Coal-to-Olefins Upgrade Demonstration Project is an upgrade and demonstration project carried out by Guoneng Baotou Coal Chemical Co., Ltd. on the basis of the world’s first coal-to-olefins demonstration plant, which has been in operation for many years. It is included among the major projects scheduled for the 13th Five-Year Plan as outlined in the \"Plan for the Innovative Development of the Modern Coal Chemical Industry\" issued by the National Development and Reform Commission and the Ministry of Industry and Information Technology. The total investment planned for this upgraded demonstration project for coal-based olefins (Phase II) is 17.15 billion yuan. The project’s capacity will be 2 million tons of methanol and 750,000 tons of polyolefins per year. By being planned in conjunction with the development of new energy sources, it aims to achieve deep integration between coal chemical processing and green electricity, green hydrogen, and green oxygen. This project is also a typical demonstration project for the upgrade of the \"million-ton-scale domestic production line for coal-to-olefins across the entire process.\" It utilizes a pulverized coal gasifier developed jointly by Collin Energy and China Shenhua Coal-to-Oil Chemical Co., with a daily coal feeding capacity of 2,000 tons per furnace. This technology not only possesses complete independent intellectual property rights but also sets a new example for collaborative innovation within the industrial chain. Furthermore, the project conducted experiments for the co-combustion of coal chemical wastewater using the powder coal gasification process for the first time, which holds pioneering significance for the advanced, diversified, and low-carbon development of modern coal chemistry.
Reply #22026-01-01
Happy New Year 2026! ! ! ! https://bbs.hcbbs.com/thread-5710045-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #32026-01-01
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-01-02
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-02
【Ten Years of Rapid Development in Chemical Equipment】Construction begins on the world’s largest onshore membrane-type liquefied natural gas storage tanks from 2025 to 2026; these 3 tanks have a storage capacity of 470 million cubic meters. https://bbs.hcbbs.com/thread-5710051-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62026-01-02
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2026: Utilizing waste materials as raw materials, China’s largest project for producing methanol from waste – Shanghai Huayi’s 100,000 tons per year green methanol facility – was put into operation at a high quality standard. https://bbs.hcbbs.com/thread-5710101-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-01-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic project for ethane recovery and co-production of LNG was completed at the Diniudi gas field in Yulin, 2949–2026. https://bbs.hcbbs.com/thread-5710164-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #82026-01-03
【History of Haichuan Chemical Industry】The Engine of Civilization: A Thousand-Year Evolution of Pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-01-04
【Ten Years of Rapid Development in Chemical Equipment】The world-leading technology for converting straw into green methanol has been put into use in Linquan County, from 2948 to 2025. https://bbs.hcbbs.com/thread-5710105-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-01-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt-class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-05
【Ten Years of Rapid Development in Chemical Equipment】The first domestic green and intelligent production line capable of producing carbon nanotubes on a scale of 1,000 tons per year was put into operation between 2025 and 2951. https://bbs.hcbbs.com/thread-5710299-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.