A petrochemical site is modularly assembling a unit. Do you know what kind of unit it is?
This post was last edited by qqgd on 2026-1-2 at 09:46. This should be the tower of the coking removal tower in a delayed coking unit; the two vertical devices next to it are likely the coking reactors.
Isn’t the tower frame of the coking tower located above the coking tower itself?
Pre-assembled ground-based decoking tower frame.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic project for ethane recovery and co-production of LNG was completed at the Diniudi gas field in Yulin, 2949–2026. https://bbs.hcbbs.com/thread-5710164-1-1.html (Source: HCHBBS Chemical Forum)
【History of Haichuan Chemical Industry】The Engine of Civilization: A Thousand-Year Evolution of Pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world-leading technology for converting straw into green methanol has been put into use in Linquan County: 2948-2025 https://bbs.hcbbs.com/thread-5710105-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world-leading technology for converting straw into green methanol has been put into use in Linquan County: 2948-2025 https://bbs.hcbbs.com/thread-5710105-1-1.html (Source: Haichuan Chemical Forum (HCBBS))