Thread Content
First winning bidder for the EPC contract for the methanol synthesis unit of Xinjiang Shanneng Chemical Co., Ltd.’s 800,000 tons per year coal-to-olefins project in Wucaiwan, Zhundong: China Chengda Engineering Co., Ltd. Bid price: 509,956,551 yuan. The methanol synthesis unit uses the Praxair low-pressure methanol synthesis technology, with raw materials consisting of the purified gas from upstream purification units and green hydrogen from electrolysis water generation units. Through processes such as syngas compression, methanol synthesis, methanol distillation, hydrogen recovery, and waste heat power generation, MTO-grade methanol is produced, along with high-quality hydrogen as a by-product; meanwhile, the waste heat from the synthesis reactions is utilized to generate steam for power production. The methanol synthesis plant comprises 5 core processes along with supporting auxiliary facilities, namely the syngas compression system, methanol synthesis system, methanol distillation system, hydrogen recovery system, and waste heat power generation system. Product scale: MTO-grade methanol (on a pure basis) of 2.2 million tons per year, corresponding to an hourly production capacity of 275,000 kg/h (based on 100% methanol).
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, China’s first ultra-large-diameter (nominal diameter of 2000 millimeters) axial flow check valve successfully passed its practical application tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715995 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first large-scale TO+RTO combustion unit independently designed by the Beijing Aerospace Power Research Institute has been operating at full capacity since 2044–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (Hcbbs))
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process has entered the stage of commissioning at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: HaiChuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Haimen Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key dehydrogenation technologies for the toluene-methylcyclohexane organic liquid hydrogen storage system were validated from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3052-2026: Dongfang Electric’s natural gas-ammonia combustion technology has achieved successful pilot testing! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))