HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Demas won the bid for the air separation unit required for Xinjiang Dongfang Hope’s 800,000-ton coal-to-olefins project

2026-01-06View Original

Thread Content

On January 4, Hangzhou Demasi Gas Equipment Engineering Co., Ltd. announced that following the successful implementation of projects by Jinhong Gas (Zibo) and Shaanxi Xinghua, the company has once again demonstrated its strength in this industry by winning the bid for a 2X120,000 Nm³/h air separation unit project to support the annual production of 800,000 tons of coal-based olefins at Xinjiang Dongming Plastic. This project is the largest order to date for electric-driven high-end air separation equipment in China. It represents another achievement for the company in its efforts to expand its presence in the Xinjiang market, and it marks another significant step forward in its strategic planning in the field of large-scale air separation systems both in Xinjiang and across the country. With this series of successful projects, Demas continues to demonstrate its strong capabilities in the field of high-end equipment, thereby providing strong impetus for the high-quality development of the company. The project of Dongfang Hope Group’s Xinjiang Dongming Plastics Co., Ltd. to produce 800,000 tons of coal-based olefins per year: Project name: Construction of Dongfang Hope Group’s Xinjiang Dongming Plastics Co., Ltd. project for producing 800,000 tons of coal-based olefins per year. Location: Modern Coal Chemical Industry Demonstration Zone, Zhundong Economic and Technological Development Zone, Xinjiang. Contractor: Xinjiang Dongming Plastics Co., Ltd. Land area required: Approximately 186.4 m2. Scale of construction: Methanol is produced using coal as raw material; thereafter, through MTO units and olefin separation processes, polymeric-grade ethylene and propylene are generated. Some of these polymeric-grade ethylene and propylene are used in PP and PE polymerization processes to produce polyolefin products, while another portion is used in the production of EPDM rubber. The facility includes facilities for producing 220x104 tons per year of methanol (in pure form), including air separation, gasification, conversion, and purification processes; 80x104 tons per year of coal-based olefins (including olefin separation processes); 400,000 tons per year of polypropylene; and 400,000 tons per year of polyethylene. In addition to its main products of PP, PE, and EPDM, the plant also produces by-products such as sulfur, liquefied petroleum gas, and heavy C4+. Investment and construction plan: The total investment for the project is 1,896,744 million yuan (including 378,350 thousand US dollars in foreign currency), of which the capital expenditure amounts to 1,755,881 million yuan (including 378,350 thousand US dollars in foreign currency). The interest on loans during the construction period is 102,591 million yuan, while the working capital required is 38,272 million yuan. The planned construction period is 24 months, with commencement scheduled for April 2024 and completion by April 2026. Project engineering components: The project components mainly include the main structure, auxiliary works, utility systems, storage and transportation facilities, environmental protection measures, and supporting projects. The main components of the project include: gasification unit, shift unit, low-temperature methanol washing unit, sulfur recovery unit, methanol synthesis unit, methanol to olefins unit, olefin separation unit, polyethylene plant, polypropylene plant, ethylene propylene diene monomer plant, and water electrolysis unit. Auxiliary facilities include air separation units, raw coal pre-drying units, flare systems, fire protection systems, maintenance areas, offices and laboratories, as well as telecommunications systems.
Reply #22026-01-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2025 to 2035, Chengdu Kene and other companies developed the world’s first megawatt-class fully liquid carbon dioxide energy storage system, which has been successfully put into operation for power generation. https://bbs.hcbbs.com/thread-5710545-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-01-06
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-01-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2954 to 2025, Hengjiu Machinery has been engaged in research and development of carbon dioxide diaphragm compressors, which have contributed to the creation of the world’s first commercial supercritical carbon dioxide power generation unit, “Chao Tan Yi Hao”. https://bbs.hcbbs.com/thread-5710546-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-08
【Ten Years of Rapid Development in Chemical Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders monitored in real time; the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2959-2026**Successful development of technology for keeping natural gas compressors running without power interruption in pipeline systems https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-09
【Ten Years of Rapid Development in Chemical Processing Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The first phase of the Jinchuan Nickel-Cobalt Heavy Metal High-Salinity Wastewater Zero-Discharge Treatment Project comes online https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #92026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2962-2025: Tianyuan Company’s first domestic laboratory facility for lignite carbonization in Shenmu’s coal chemical industry has been successfully put into operation. https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-10
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.