Thread Content
According to the \"Code for Design of Layout of Metal Piping in Petrochemical Industries\" SH/T3012-2011, 10.2.9: For the safety valve outlet pipe that leads directly upward into the atmosphere, a drainage hole with a diameter of 6 mm to 10 mm should be provided near the elbow at the lower end of this pipe.
【Common Issues in Haichuan Pipeline Design】Using this method for static grounding on such large pipelines seems rather inadequate. https://bbs.hcbbs.com/thread-5703310-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】--Which media require closed-loop sampling https://bbs.hcbbs.com/thread-5703314-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】By 2025, the domestic production rate for such equipment will exceed 98%; the first phase of the coal-to-natural gas project in the Northeast region has been completed in its entirety. https://bbs.hcbbs.com/thread-5703054-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The hydrolysis-resistant PBT catalyst developed by SINOPEC Shanghai Research Institute has been successfully put into industrial use from 2025 to 2745. https://bbs.hcbbs.com/thread-5703070-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The hydrolysis-resistant PBT catalyst developed by SINOPEC Shanghai Research Institute has been successfully put into industrial use from 2025 to 2745. https://bbs.hcbbs.com/thread-5703070-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2748-2025: Bohai Equipment Achieves Domestic Production of Key Components for High-Power Flue Gas Turbines https://bbs.hcbbs.com/thread-5703099-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】2749–2025: China’s largest-pipe diameter cracking gas valves – The 60-inch ultra-large-diameter cracking gas valves used at Tianjin Nangang Ethylene Plant have passed industrial application tests. https://bbs.hcbbs.com/thread-5703102-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2751-2025 Three Gorges Group project for the development and application demonstration of large-scale compressed air energy storage systems and related key equipment has successfully begun generating electricity. https://bbs.hcbbs.com/thread-5703150-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 3000HP five-cylinder pump intelligent operation and maintenance system, independently developed by Lanshi Equipment Company, was completed and tested between 2025 and 2752. https://bbs.hcbbs.com/thread-5703151-1-1.html (Source: Haichuan Chemical Industry Forum)