【Daily Topic】【Engineering Version 20161231】

2016-12-31View Original

Thread Content

This post was last edited by yuchenchf on 2017-1-3 15:04. Reward for participation: 2 wealth points. Correct reward: 9 wealth. The items to be checked in the construction progress plan include (  ). A. The deviation between the actual progress and the planned progress. B. The status of rectification for the issues identified in the previous inspection. C. The utilization of resources and the measures taken to ensure progress. D. The compliance with work schedules. E. The completion level of the workload. BCDE
Reply #22017-01-01
B. Status of rectification for issues identified in the previous inspection C. Status of resource utilization and progress assurance D. Compliance with working hours E. Completion status of work volume

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.