HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【HVAC Version 20170320】

2017-03-20View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 8 Wealth. Multiple-choice question: When a heating pipeline must pass through a firewall, what measure should be taken? A. Fixing, sealing B. Insulation C. Thermal insulation D. Adding a sleeve A
Reply #22017-03-20
When heating pipes must pass through a fire wall, (A) measures should be taken. A, Fixing and sealing B, Insulation C, Thermal insulation D, Adding a sleeve

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.