I would like to ask the experienced colleagues: what types of professional drawings are required for the as-built drawings of fire protection inspections for chemical processing plants?

2019-05-15View Original

Thread Content

I would like to ask those with experience in chemical plant project management, design, and construction: what type of professional drawings are required for the fire safety inspection conducted after a chemical plant is completed? :o
Reply #22019-05-16
Design documents, construction documents, and commissioning records that have passed fire safety inspections.
Reply #32019-07-25
Building plans, fire protection system layout diagrams, details of fire protection equipment, certification documents, certificates of conformity, and quality inspection records are all required.
Reply #42019-08-23
For fire protection, all basic drawings are required except for the structural drawings. Completion requires the completion documents from the construction unit and the supervision documents from the supervision unit. By sub-region, some areas may also require fire safety inspections.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.