HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipeline support distance

2017-05-16View Original

Thread Content

I’m not a professional in pipeline work. I would like to ask whether a support is needed for the 6-inch pipe shown in the diagram, given that the distance between the two pipe ends is less than 5.2 meters. Additionally, I’d like to understand the exact meaning of Note 2 in Table 3 of the standard mentioned below. If you know how, please translate it: MSS SP-69-2003 – Pipe Hangers and Supports: Selection and Application, Table 3, Note 2: This does not apply where span calculations are performed, or where there are concentrated loads between the supports such as flanges, valves, special fittings, or changes in direction that require additional supports.
Reply #22017-05-17
I just have one question: without any support, what do you do when replacing the valve?
Reply #32017-05-17
It does not apply where span calculations are performed, or where there are concentrated loads between supports such as flanges, valves, special components, or situations where a change in direction requires additional supports. It is not suitable for pipelines for which span calculations have been done, nor for areas where loads are concentrated between supports, such as flanges, valves, special components (flanges, expansion joints, rupture disks, flow meters, etc.), or locations where a change in flow direction necessitates the addition of extra supports.
Reply #42017-05-18
Thank you for your reply. If possible, could a temporary support be used to hold it in place?
Reply #52017-05-18
In that case, according to Table 3 of MSS SP-69-2003, the distance between the two pipe ends is 4.7 m
Reply #62017-05-18
Not applicable. Where is it not applicable?
Reply #72017-05-18
This post was last edited by lightemplar123 on 2017-5-18 at 13:45. Temporary support?
Reply #82017-05-18
Pipe-Hangers-and-Supports---Selection-and-Application: The selection of pipe supports and hangers is not applicable in cases where span calculations are required, or where there are concentrated loads between the supports, such as those caused by flanges, valves, other components, or direction changes that necessitate additional supports. It is not suitable for use in situations involving span calculations, or in cases of concentrated loads between supports due to elements like flanges, valves, etc., or direction changes that require extra support.
Reply #92017-05-18
This is something that requires engineers to rely on their experience based on the actual situation
Reply #102017-05-18
Why temporary? The cost of temporary setup might be even higher
Reply #112017-05-20
For a similar pipeline, do you think brackets are needed?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.