HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Pipeline Valve Technology Edition-Daily Question on Common Piping Mistakes] 20170814

2017-08-14View Original

Thread Content

Discussion of common piping errors 029: Which of the following designs (piping design of oil and gas pipes at the top of the tower) is correct? AB Answer: B. Generally, the oil and gas pipes at the top of the tower have two-phase flow. Each condenser branch pipe should be led from the bottom of the main pipe, or the bottom of the horizontal pipe should be consistent to prevent liquid accumulation in the main pipe.
Reply #22017-08-14
This post was last edited by mdchl on 2017-8-14 10:02 B

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.