HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

“What is the design responsibility for the “current status map”?

2017-11-14View Original

Thread Content

The enterprise’s safety production license needs to be renewed every three years. An assessment is required before renewal, and drawings are needed for this; if issues related to fire separation distances are identified, existing site plans are used as a substitute, on the grounds that the responsibility associated with such plans is lesser. But upon checking the specifications, there is no such term as a status map; so how is the responsibility for designing the status map allocated?
Reply #22019-10-08
Plagued by the same problem::L
Reply #32019-10-09
If nothing goes wrong, that’s fine; but if something goes wrong and it doesn’t comply with the standards, no image can escape
Reply #42019-10-09
Our approach is to mark the areas that do not comply with the standards on the current status diagram, and attach a revised drawing thereafter
Reply #52019-10-09
Another view is to take the latest drawings released by the company as the standard

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.