Is the process package for the newly built skid-mounted facility required to undergo design review?

2018-06-11View Original

Thread Content

This post was last edited by sdwfsgyykai on 2018-6-12 08:55. Is it necessary to have the process package for new skid-mounted facilities designed and reviewed? If necessary, then there is a standard that includes such content; thank you!
Reply #22018-06-12
This skid-mounted facility should be designed by a qualified design institute; it represents a fully developed process unit in terms of processes, equipment, and electrical control systems. Generally, the head office does not carry out design reviews for such units, but only verifies the connection conditions and auxiliary facilities. The responsibility for the design lies with the manufacturer of the skid-mounted unit
Reply #32018-06-12
Whoever designs it is also the one who reviews it; for skid-mounted units, the design, equipment manufacturing, and assembly are all handled by the same party

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.