HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to implement process isolation

2019-04-18View Original

Thread Content

During the major repair, a flow meter needs to be installed on this pipeline (for use in the flare system). The general process is as follows: the waste gas emitted from the rubber factory enters the liquid separation tank and then the water seal tank, from where it is sent to the flare for combustion. How should isolation be implemented in this process?
Reply #22019-05-16
Install blind flanges at the flanges, and perform purging and displacement before carrying out hot work

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.