HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

RDS residue hydrogenation

2019-06-12View Original

Thread Content

Why is nitrogen purging carried out only when the reactor temperature and the inlet temperature of the heat high separator exceed 93°C during the shutdown and catalyst replacement process for residue oil?
Reply #22019-06-12
It seems that hydrogen dissolved in the wall of the vessel at 93°C can be released to the greatest extent
Reply #32019-07-08
The hydrogen release during the constant-temperature stage should be nearly complete by now. Does it really have to be reduced to this temperature?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.