I have some questions regarding the \"HG/T 20680-2011 Specifications for Process Calculations in Boiler Room Design\"

2019-11-11View Original

Thread Content

This post was last edited by chalisen on 2019-11-11 21:44. 1. The formula below is used to calculate the height of a chimney. In the formula, does 1611U10 mean 1611 multiplied by U10? 2.316U10 – is it 2.316 multiplied by U10? 2. May I ask which member has used this set of formulas to calculate the height of a chimney? Are there specific design parameters available? 3. According to the HG/T 20680-2011 Specifications for Process Calculations in Boiler Room Design, the maximum rounded height for chimney height is 150 meters; what should be done in cases where the height is greater than this? I earnestly ask for your advice!
Reply #22019-11-25
1. 1.611U10 means 1.611 multiplied by U10; there is no value for 2. As for 3, it might be a requirement specific to the chemical industry; in the thermal power sector, values of over 200 meters are common
Reply #32022-12-08
Dampers can be installed at the top of tall chimneys! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.