HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Piping

2020-06-24View Original

Thread Content

The tank area is tilted, while the pump set is aligned straight; should the pipes run along the fire dike or be arranged in a north-south direction? I seek guidance from those experienced in piping design
Reply #22020-06-24
The piping should follow the shortest route possible to minimize material usage; when selecting a path, it is necessary to ensure that the interior angle of the bends is at least 90 degrees. After all, the longer the pipeline and the smaller the interior angle of the bends, the greater the resistance. You can rearrange the pipes in this image according to your actual needs. The convenience of maintenance also needs to be taken into account.
Reply #32020-06-30
Align the north indicator properly; ensure proper piping with the pump and tank parallel to each other.  The requirements are specified in the piping design reference books.  With this type of tank inclination, the pump has quite a few design issues

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.