【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia

2025-12-26View Original

Thread Content

Let’s give praise and support to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Progress in Chemical Engineering Equipment】Regular updates and summaries are available; feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html ***************** On December 16, 2025, progress was reported on the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia – the space pyrolysis unit, for which technology and equipment were provided by the Beijing Aerospace Power Research Institute under the Sixth Academy of the China Aerospace Science and Technology Corporation, was successfully completed mechanically. This marks the fulfillment of the key tasks related to the construction phase of this first industrial unit, paving the way for subsequent debugging activities. This device is designed for handling various types of solid waste such as plastic materials with low residual value, packaging drums, and agricultural films generated from agricultural and domestic sources, as well as industrial hazardous waste like oil sludge produced during oil extraction, tank cleaning sludge, and oil-contaminated materials. It utilizes the space pyrolysis technology developed by the Beijing Institute of Aerospace Propulsion to enable the high-value recycling of these plastic wastes and sludges. Construction of the project began in March 2025, and over a period of ten months, all the facilities required were built, including material storage warehouses, pre-treatment units, main production units, VOC treatment systems, as well as utility systems, tank farms, and comprehensive office buildings. On that day, the owner, Inner Mongolia Xuneng Environmental Technology Co., Ltd., organized a meeting to summarize the completion of the mechanical work; Li Xiaofeng, director of the Beijing Aerospace Power Research Institute, Wang Xiaodong, deputy director, Zhang Yanjun, the person in charge of aerospace pyrolysis technology, and representatives of the team attended the meeting. The project owner highly appreciates the dedication and selfless efforts of the project team, and is very optimistic about the role that this facility will play in advancing regional environmental protection and resource recycling in the future. Director Li Xiaofeng emphasized that the team will take the completion of mechanical construction as a new starting point, make every effort to carry out the \"three inspections and four determinations\" for rectification, and provide professional and efficient services to ensure smooth subsequent commissioning and operation, so as to guarantee that the technical achievements are effectively put into practice. As the first industrial installation for aerospace pyrolysis technology, this mechanical completion marks a key milestone in advancing this technology from the research and development stage to practical engineering application. It not only provides a platform for the industrial validation of innovative technical achievements and parameter optimization in the two fields of chemical recycling of waste plastics and advanced treatment of industrial sludge, but also, by focusing on the practical implementation of hardware, lays a solid foundation for the further industrialization of aerospace pyrolysis technology. https://mmbiz.qpic.cn/sz_mmbiz_gif/MjibN9jlYtLM6P5LH1jGJ5tfJ8oFt83cs3yjH4uhD9EgNhVUeEPgDsvPaMxCGXFuvNNbXSA9kxoGqY0ic3uygffg/640?wx_fmt=gif#imgIndex=5
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Domestically developed unmanned emergency rescue equipment set released for the period 2023–2025: https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #62026-01-02
【Ten Years of Rapid Development in Chemical Equipment】Construction begins on the world’s largest onshore membrane-type liquefied natural gas storage tanks from 2025 to 2026; these 3 tanks have a gas storage capacity of 470 million cubic meters. https://bbs.hcbbs.com/thread-5710051-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.