HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Successful commissioning of the krypton and xenon extraction technology system in Henan Carrier cryogenic air separation unit

2026-03-23View Original

Thread Content

On March 16, another piece of good news came from Henan Carrier Air Separation Equipment Group Co., Ltd.: the krypton and xenon extraction system built based on the 40,000 Nm³/h large-scale air separation unit that is already in operation at Jinan Iron and Steel successfully completed its commissioning process. The entire process was operational, and qualified oxygen, nitrogen, argon, as well as crude krypton and xenon products were produced; the levels of key impurities in the crude krypton and xenon met or exceeded the design specifications. This is yet another perfect demonstration by Henan Carrier of the krypton and xenon extraction technology in cryogenic air separation units. The krypton-xenon extraction system is a key element in enhancing the added value of air separation units and achieving comprehensive resource utilization. This system extracts krypton- and xenon-depleted feed materials from the liquid oxygen in the air separation tower, and by utilizing the existing large-scale air separation unit at Jinan Iron and Steel, it enables efficient recovery of rare gas resources. The successful commissioning of this 40,000-capacity air separation krypton-xenon extraction system represents yet another outstanding achievement by Henan Carrier in the field of gas processing. It not only enhances a company’s core competitiveness and economic efficiency, but also makes positive contributions to driving technological progress in the industry and promoting the efficient use of resources. Henan Carrier is dedicated to the research, development, and application of industrial gas separation and purification technologies, and possesses extensive experience in large-scale air separation units and rare gas extraction. The company will continue to drive technological innovation to provide customers with high-quality gas products and services.
Reply #22026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2038 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process has entered the commissioning phase at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-03-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #52026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system was approved for use, 3051–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-03-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-03-29
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are crowded together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-class CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating steadily for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of China’s first independently developed 1500kN intelligent positioning winch system integration, 3055–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716494 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.